Highway Partial Depth Repairs
Phoscrete made 10,000 repairs on a 50 mile stretch of heavily-travelled highway in one of the largest partial depth highway renewal projects ever.
Bridge Pier Repair
Phoscrete repaired the damaged concrete on a bridge support.
Tunnel/Bridge Ramp Repair
Phoscrete repaired spalled concrete on a bridge that runs under a tunnel.
Highway Accident Road Repair
Following an automobile accident, Phoscrete made partial depth slab repairs, and the highway was opened to traffic within one hour after placement.
Bridge Beam Repair
Phoscrete repaired the damaged concrete caused by rusting rebar in a structural beam, eliminated the rust, and inhibited future corrosion.
Auto Pavilion Repair
Phoscrete quickly repaired deteriorated concrete structures at the Michigan State Fair’s Auto Pavilion.
Bridge Barrier Wall Repair
Phoscrete joined and chemically bonded segmented sections of a bridge wall to create a continuous barrier wall.
Power Plant Coal Silos
Phoscrete lined the sloping portions of 28 rust-deteriorated coal silos and quickly restored them to normal operation.
Anode Casting Floor Repair
Phoscrete quickly repaired a concrete floor damaged by heavy traffic and thermal degradation in a copper smelting plant.
Steel Plant Floor Repair
Phoscrete repaired a severely damaged concrete floor in a steel plant.