Phoscrete Team Repairing Damaged Concrete

Cold Outside? Give your Phoscrete a Warm Hug!

I wish we had the photo. Donny (our installation support manager) and Matt (our Northeast Sales Rep) were on-site with an east coast contractor installing Phoscrete on a Rhode Island Bridge on a cold morning in January.

Temps were in the 30s and the wind off the bay was biting. Using our Fast-Set Admix, the crew mixed and placed Phoscrete VO on the spalled pier columns.

The exothermic reaction that activates our MALP concrete gave off some serious heat as the VO achieved initial set after about 30 minutes.

One dude on the crew was shivering, so he wrapped his arms around the column for warmth!

If you have concrete to repair this winter, Phoscrete sets fast and bonds strong to vertical and horizontal concrete structures. Phoscrete will fix it fast, even when the temperature drops below zero F.

Give us a call (and a hug).

-Your friends at Phoscrete